HOW TO SET UP A TUB: INSTALL AN ACRYLIC BATHTUB AS WELL AS TUB SURROUND

How to Set up a Tub: Install an Acrylic Bathtub as Well as Tub Surround

How to Set up a Tub: Install an Acrylic Bathtub as Well as Tub Surround

Blog Article

Get A Quote

We've noticed this article on How to Install a Bathtub listed below on the net and accepted it made sense to relate it with you on this page.


How to Install a Bathtub: Install an Acrylic Tub and Tub Surround
Mounting a bath tub isn't precisely brain surgery, however it does need solid plumbing, carpentry, and sometimes, tiling abilities. Changing an old bath tub with a brand-new one is likewise a moderately challenging project. If the old bathtub is conveniently easily accessible, the job can move quickly; if you have to open up a wall to eliminate the old tub as well as position the brand-new bath tub, the job is a lot harder. In either instance, the job is within a house handyman's abilities, although you will need an assistant to vacate the old tub and embeded in the brand-new one. Make certain you have qualified on your own for the task and are comfortable trying it. Instead of hiring a specialist to take control of a halfway-completed job, it is better to consider using one prior to you start. Possibilities are you might require an expert plumber to make tube connections.
This article will certainly help you install a brand-new tub in your bathroom if you have actually already bought a brand-new tub and also do not need to transform the plan of your previous supply of water pipes.
Your devices and also material checklist need to make up the following:
  • New Bathtub

  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Adjustable Wrench

  • Putty Blade

  • Screwdriver

  • Cold Blade

  • Tape Measure

  • Pipeline Caps


  • Removing Old Taps


    If you require to replace old faucets with new ones as a part of your installment, then the first thing you need to do is detach the water supply. After doing so, switch on the taps to drain pipes any water staying in the system. The process of removing the existing faucets can be quite bothersome due to the limited access that is commonly the case.
    Make use of a basin wrench (crowsfoot spanner) or a faucet tool to undo the nut that attaches the supply pipes to the faucets. Have a cloth prepared for the remaining water that will originate from the pipes. As soon as the supply pipes have been gotten rid of, use the exact same device to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to quit the solitary taps from transforming during this procedure. Once the faucets have been gotten rid of, the holes in the bath/basin will need to be cleaned of any kind of old securing substance.
    Before carrying on to fit the brand-new taps, contrast the pipeline connections on the old taps to the brand-new faucets. If the old taps are longer than the new faucets, after that a shank adapter is required for the new faucets to fit.

    Suitable New Taps


    If the tails of the new faucets are plastic, after that you will need a plastic port to stop damage to the thread. One end of the port fits on the plastic tail of the faucet and the other end supplies a link to the existent supply pipes.
    If you need to fit a monobloc, after that you will certainly call for decreasing couplers, which connects the 10mm pipe of the monobloc to the common 15mm supply pipeline.
    Next, place the faucet in the mounting opening in the bath/basin making certain that the washing machines are in location in between the faucet and the sink. Protect the faucet in position with the manufacturer supplied backnut. As soon as the faucet is safely in position, the supply pipelines can be linked to the tails of the faucets. The taps can either be connected by using corrugated copper piping or with normal tap connectors. The former type should be connected to the faucet finishes initially, tightening up just by hand. The supply pipelines can later be linked to the other end. Tighten both ends with a spanner after both ends have been attached.

    Mounting the Bath tub


    Making use of both wood boards under its feet, put the tub in the required position. The wooden boards are handy in equally spreading out the weight of the tub over the area of the boards instead of focusing all the weight onto 4 tiny factors.
    The next goal is to ensure that the bath tub is leveled all round. This can be attained by inspecting the spirit level and readjusting the feet on the bath tub up until the spirit level reads degree.
    To set up taps, fit the bottom of the outermost flexible tap connector to the appropriate supply pipe by making a compression join; then do the same for the various other faucet.
    Activate the water and also examine all joints and also brand-new pipework for leakages as well as tighten them if needed. Fill up the tub and also check the overflow outlet and the regular electrical outlet for leakages.
    Lastly, take care of the bath paneling as explained in the producer's user's manual. Tiling as well as sealing around the bathtub should wait until the bath tub has actually been utilized a minimum of once as this will resolve it right into its final setting.

    Planning for the Setup


    To start with, the sustaining frame provided with the bath must be fitted (if required) according to the supplier's directions. Next off, fit the taps or mixer to the bath tub. When fitting the faucet block, it is very important to make sure that if the faucet comes with a plastic washer, it is fitted in between the bath and also the taps. On a plastic bathroom, it is also reasonable to fit a supporting plate under the faucets unit to avoid strain on the tub.
    Fit the adaptable tap adapters to the bottom of the two faucets using 2 nuts as well as olives (sometimes supplied with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink electrical outlet opening, and after that pass the electrical outlet through the hole in the bathroom. Use the nut supplied by the supplier to fit the plug-hole. Analyze the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
    Next, fit completion of the flexible overflow pipe to the overflow electrical outlet. After that, screw the pipe to the overflow face which must be fitted inside the bath. Ensure you make use of all of the supplied washing machines.
    Attach the trap to the bottom of the waste electrical outlet on the bath tub by winding the thread of the waste outlet with silicone mastic or PTFE tape, as well as screw on the catch to the outlet. Link all-time low of the overflow tube in a comparable manner.The bath must currently prepare to be fitted in its final placement.

    Tiling Around the Bath tub


    In the area where the bath fulfills the floor tile, it is necessary to seal the accompanies a silicone rubber caulking. This is necessary as the fitting can move sufficient to fracture an inflexible seal, causing the water to permeate the wall surface in between the bathroom and the tiling, resulting in problems with moisture and also feasible leaks to the ceiling below.
    You can choose from a range of coloured sealers to assimilate your components and also fittings. They are sold in tubes and cartridges, as well as are capable of securing spaces approximately a size of 3mm (1/8 inch). If you have a bigger void to fill, you can fill it with twists of soaked newspaper or soft rope. Remember to always fill up the tub with water before securing, to enable the motion experienced when the bathtub remains in usage. The sealer can split rather very early if you do not think about this activity prior to securing.
    Conversely, ceramic coving or quadrant floor tiles can be made use of to border the bathroom or shower tray. Plastic strips of coving, which are easy to use and also reduce to dimension, are additionally conveniently readily available on the marketplace. It is a good idea to fit the floor tiles using water-resistant or water resistant sticky as well as grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    Tools You Need to Install a New Bathtub

    I hope you enjoyed our section about Tools You Need to Install a New Bathtub . Many thanks for taking time to read through our posting. Liked our post? Please share it. Help someone else locate it. Thanks a lot for taking the time to read it.




    Top Article


    Report this page